1 of 17
Production hall for sale 2125 m²
Klatovy, K Letišti 53238 667 000 Kčfor propertyprice for a broker
- This description is in:
Energy G
Description
- This description is in:
Machine translation
The object of the sale is an industrial site with a total area of land 9 135 m² situated in the established Klatovy II commercial zone. The complex represents a balanced set of real estate, which in one closed unit combines administrative headquarters, heated production and service facilities, separate storage facilities and exceptional development area for new construction. The dominant element of the whole complex is the dimensioned transport and handling skeleton - more than 7 000 m² consists of "heavy duty" reinforced surfaces. The area is adapted for easy entry, turning and shutdown of heavy truck transport, outdoor material storage and offers direct connection to the freight ramp. All existing buildings are fully connected to complete engineering networks (230 / 400V electricity, gas pipeline, urban water pipeline, sewage). The key advantage of the property is its technical readiness for immediate operation and future growth. While the two-storey administration building (359 m²) and the main production hall with the facilities (592 m²) are fully operational and do not require additional investment, two built-in hall newly built (740 m²) with finished steel constructions and the roof allow the expansion of the covered utility area without lengthy processing of building permits. Separate warehouse object (434 m²). Moreover, the unique layout of the buildings allows not only the operation of one large company, but also a variable division into several separate rental sections. Disposable and structural solution of the complex: Modernised administration building: Two-storey brick building after reconstruction (heating, plastic windows, new roof, gas heating). It offers offices, meeting rooms, complete social facilities (WC, showers), dressing rooms and kitchenette. Main Production and Storage Hall No.
905: A combined building consisting of a heated hall with new insulation panels, industrial concrete floor and section doors, and a walled workshop part with mounting pit and background. Built-in extension hall: Two successive new buildings with steel hoop construction and sandwich PUR panels (construction approx. 45%). Ready for completion according to the specific technological needs of the new owner. Separate storage facility: Steel hall suitable for reconstruction or use as backup storage. Outdoor equipment: Cargo ramp, steel shelter and separate concierge. Infrastructure and networks: The area is fully connected to the electricity network (both light and motor), public water supply, sewerage and gas. Location: Klatovy II is a sought-after industrial location with excellent accessibility to Pilsen (40 km) and at border crossing points with Germany. The advantage is enough skilled labour in the region. This complex is a great business opportunity for companies looking for an immediate background with the possibility of flexible growth, as well as for investors focused on real estate appreciation. If you're interested, don't hesitate to contact me.
905: A combined building consisting of a heated hall with new insulation panels, industrial concrete floor and section doors, and a walled workshop part with mounting pit and background. Built-in extension hall: Two successive new buildings with steel hoop construction and sandwich PUR panels (construction approx. 45%). Ready for completion according to the specific technological needs of the new owner. Separate storage facility: Steel hall suitable for reconstruction or use as backup storage. Outdoor equipment: Cargo ramp, steel shelter and separate concierge. Infrastructure and networks: The area is fully connected to the electricity network (both light and motor), public water supply, sewerage and gas. Location: Klatovy II is a sought-after industrial location with excellent accessibility to Pilsen (40 km) and at border crossing points with Germany. The advantage is enough skilled labour in the region. This complex is a great business opportunity for companies looking for an immediate background with the possibility of flexible growth, as well as for investors focused on real estate appreciation. If you're interested, don't hesitate to contact me.
Other parameters
- long-distance water supply
- gas boiler
- asphalt
- No
- 2125 m2
- outskirts of the municipality
- public sewer
- 7135 m2